JavaScript must be enabled in order to use this site.Please enable JavaScript in your browser and refresh the page. Configuring the Revision Action Setting Note: The following setting is a prerequisite to using the AssetWise ALIM ProjectWise Connector Level 2 Connector. Follow these steps to set the document revision action. In AssetWise ALIM Web, select the Settings icon ( ), and then select the System Preferences link. Expand the ProjectWise group. In the ProjectWiseLevel2RevisionAction box, select one of the following options from the list: ReviseAlways: Select this option to always revise documents even if the current revision is not approved orOnlyApproved: Select this option if you want to revise a document only if its current revision is set to "Approved". When you are finished, click Save. Parent topic: AssetWise ALIM ProjectWise Connector Settings